Third pier at Scarinish harbour

Google Map

Object Type:

Summary

Used at very low tide. A series of metal stanchions and a concrete ramp were installed, possibly during the Second World War. There is a small quay at the water’s edge.

β€˜The Boat Slip is making good progress. Bags of cement, one upon the other, are laid in front, and already the slip is proving of some use for boats going out to the steamers. Mr MacArthur and his assistant spare no pains in making the slip a complete success. It will be of the utmost value to the island. β€˜ (Oban Times and Argyllshire Advertiser 27 October 1900, 6)

Island :

Township :

Current Location :

Museum Number :

Material:

Year Collected:

Collector :

Related Objects