Third pier at Scarinish harbour
Google Map
Object Type:
Summary
Used at very low tide. A series of metal stanchions and a concrete ramp were installed, possibly during the Second World War. There is a small quay at the water’s edge.
βThe Boat Slip is making good progress. Bags of cement, one upon the other, are laid in front, and already the slip is proving of some use for boats going out to the steamers. Mr MacArthur and his assistant spare no pains in making the slip a complete success. It will be of the utmost value to the island. β (Oban Times and Argyllshire Advertiser 27 October 1900, 6)
βThe Boat Slip is making good progress. Bags of cement, one upon the other, are laid in front, and already the slip is proving of some use for boats going out to the steamers. Mr MacArthur and his assistant spare no pains in making the slip a complete success. It will be of the utmost value to the island. β (Oban Times and Argyllshire Advertiser 27 October 1900, 6)
Links (open in a new window)
Island :
Township :
Current Location :
Museum Number :
Period:
Material:
Year Collected:
Collector :
Related Objects